Tapioca
Botanical Name – Manihot esculenta Crantz
Family- Euphorbia
CO 2, CO 3, CO (Tp) 4, CO (Tp ) 5, MVD 1, H 165, H 226, Sree Visakham
(H.1687), Sree Sahya (H.2304), Sree Prakash (S. 856), Sree Vijaya, Sree Jaya, SreeRekha, Sree Prabha, Sree Athulya, Sree Raksha (CMD resistant), Yethapur 1 (YTP 1)
Soil –
Well drained soil preferably red lateritic loam with a pH range of 5.5-7.0 is ideal.
Climate-
- Thrives best in tropical, warm humid climate with well distributed rainfall of over 100 cm per annum.
- Cultivated upto an elevation of 1000 m.
- Plant throughout the year under irrigation.
- Plant during April for rainfed crop.
- Select healthy mosaic free vigorous plants for taking planting materials.
- Prepare setts of 15 cm long with 8 – 10 nodes from the middle portion of the stem.
- Avoid mechanical damage while preparation and handling of setts.
- The cut end should be uniform. Dip the setts in Carbendazim 1 g in one liter of water for 15 minutes before planting to prevent tuber rot.
- Dip the setts in Dimethoate @ 2 ml/litre of water + Carbendazim @ 2 g/litre of water for 15 minutes before planting.
- Scale insects and mealy bug adhering to the planting materials may be destroyed by the sett treatment
- Plant the setts vertically with buds pointing upward on the sides of ridges.
- 12,500 setts are needed for planting one ha.
- For rainfed conditions, treat the setts with a mixture of potassium chloride @ 5 g/lit and micronutrients viz., ZnSO4 and FeSO4 each @ 0.5% for 20 minutes.
- Dip the setts for 20 minutes in Azospirillum and Phosphobacteria each at 30 g/l
Virus elimination and tissue culture in cassava
- The protocol for virus elimination through tissue culture has been standardized for the varieties MVD 1 and H 226 by using meristem culture.
- The Murashige and Skoog (MS) medium supplemented with BAP at 0.1 mg/l for meristem establishment and shoot growth and MS medium without growth regulators for rooting have to be followed.
- The in vitro plantlets are to be hardened in sterile pot mixture (sand : soil : FYM in 1 : 1: 1) under mist chamber for 10-15 days and later kept under shade net for 10 days before transferring them to the open field.
- Plough the field 4 – 5 times to get a fine tilth.
- The soil depth should be atleast 30 cm.
- Form ridges and furrows at the following spacings:
Irrigated
75 x 75 cm (17,777 setts) and 90 x 90 cm (12,345 setts).
Rainfed
60 x 60 cm (27,777 setts)
Under Kanyakumari conditions
90 x 90 cm (12,345 setts
- First irrigation is given at the time of planting.
- Life irrigation is given on the 3rd day followed by once in 7 – 10 days
- upto 3rd month and once in 20 – 30 days upto 8th month.
- Install drip system with main and sub-main and place the inline laterals at the interval of 1.5 m.
- Place the drippers at the interval of 60 cm for 4 LPH and 50 cm for 3.5 LPH in the lateral system.
- Form the raised beds at 120 cm width at an interval of 30cm and place the
laterals at the centre of each bed.
- Raise CO 2 vegetable cowpea during March and harvest green pods before planting cassava during June –July.
- After green pod harvest, incorporate the cowpea haulms into the field by disc ploughing.
- Through sequential cropping, 50% reduction in application of FYM
(12.5 t/ha) and P (30 kg/ha) is ensured.
- Irrigated crop
- Apply 25 t FYM/ha and incorporate at the time of planting.
- Apply 45:90:120 kg NPK/ha as basal and 45:120 kg NK/ha 90 days after planting during earthing up.
- Apply 25kg ZnSo4, 20 kg S as gypsum, 10 kg Borax ha-1 as basal soil application.
- Rainfed crop
- Apply FYM at 12.5 t/ha along with 50 kg N, 65 kg P and 125 kg K/ha as basal.
- Apply 2 kg of Azotobactor through soil application at 30 – 60 days after planting on receipt of showers (2.0 kg Azotobacter + 20 kg FYM + 20 kg soil per hectare).
Fertigation
90: 90 :240 kg of NPK / ha. Apply once in every three days throughout the cropping
period.
Spacing
60 x 90cm in paired row system.
Stage | Crop stage | Duration in days | Fertilizer grade | Total Fertilizer (kg/ha) | Nutrient applied | % of requirement | ||||
N | P | K | N | P | K | |||||
1 | Planting to crop establishment | 20 | 19:19:19 +MN 13.0:45 0-0-50 | 23.57 34.67 7.87 | 4.48 4.50 – | 4.48 – – | 4.48 15.60 3.93 | 10.00 | 5.00 | 10.00 |
Subtotal | 8.98 | 4.48 | 24.01 | |||||||
2 | Vegetative stage | 30 | 12:61:0 13:0:45 Urea | 11.40 105.33 26.80 | 1.34 13.69 12.33 | 6.80 – – | – 47.39 – | 30.00 | 7.50 | 20.00 |
Subtotal | 27.36 | 6.80 | 47.39 | |||||||
3 | Tuber formation stage | 35 | 12:61:0 0:0:50 Urea | 11.40 144.00 55.73 | 1.34 – 25.64 | 6.80 – – | – 72.00 – | 30.00 | 7.50 | 30.00 |
Subtotal | 26.98 | 6.80 | 72.00 | |||||||
4 | Tuber development stage | 35 | 19:19:19 + MN 0-0-50 Urea | 23.57 182.67 48.87 | 4.48 – 22.48 | 4.48 – – | 4.48 92.34 – | 30.00 | 5.00 | 40.00 |
Subtotal | 26.96 | 4.48 | 96.82 | |||||||
Total | 90.28 (or) 90 | 22.56 (or) 22.50 | 240.22 (or) 240 | 100 | 25 | 100 |
75% RD of Phosphorus applied as superphosphate 421.88 kg/ha.
1. 19:19:19 = 47. kg / ha.
2. 13:0:45 = 140kg/ha.
3. 12:61:0 = 23kg/ha
4. 0:0:50 = 335kg / ha
5. Urea = 132 kg / ha.
Chlorosis
Foliar spray of 1% FeSO4 + 0.5% ZnSO4 at 60 and 90 DAP.
After Cultivation
- Fill up the gaps within 20 days of planting.
- Carry out first weeding 20 days after planting.
- Subsequent weeding should be done once in a month upto 5 months depending
upon the weed intensity. - Thin to two shoots per plant during 60th day.
- Grow aggregate onion, coriander, short duration pulses and short duration vegetables as intercrops from planting date upto 60 days
1.Spiralling whitefly: Aleurodicus disperses
Symptoms of damage:
Management:
2.Whitefly: Bemisia tabaci
|
4.Cassava mealy bug : Paracoccus marginatus
Symptoms of damage:
Management:
|
1.Mosaic
Management-
- Select the planting materials from healthy plants
- Remove alternate weed hosts viz., Abutilon indicum
- Install yellow sticky trap at 12 Nos/ha
- Use nitrogen judiciously
- Avoid excessive irrigation
- Spray neem oil @ 3 % or fish oil rosin soap @ 25 g/l
- Apply methyl demeton in the early stage and phosalone in the late stages of crop growth
2.Cercospora Leaf spot
- Spray mancozeb @ 2 g/l twice at 15 days interval
3.Tuber rot
- Avoid water stagnation
- Give good drainage facilities
- Spot drench with copper oxychloride @ 2.5 g/l or soil application of Trichoderma asperellum @ 2.5 kg/ha as basal and at 3rd and 6th month after planting
9 to 11 months
- Crop can be harvested at 9 to 11 months after planting.
- During tuber maturity, the leaves become yellow and 50 % of leaves become dried and sheds off.
- The soil near the stem base of the stem shows cracking.
- Tubers can be uprooted by using fork or crow bar.
Irrigated : 40 – 50 t/ha
Rainfed : 20 – 25 t/ha
Crop Growing districts Salem, Namakkal, Erode, Dharmapuri, Villupuram
Major markets in Tamil Nadu Salem, Dharmapuri, Erode